Dry Tank Technology: Installation Instructions
This sections provide the installation instructions for the Dry Tank Technology dryer and a link to the preliminary instruction manual.
Connecting the DTT dryer to a compressor
Identify pipe between compressor head & receiver Disconnect pipe Replace with interface pipe Also onto the receiver valve Fit the male to male stud Connect to the flexi-link Connect plastic tube to receiver Cut eh pressure switch connection pipe Insert tee-connector and reconnect pipwork
Final Installation: Overview of Pneumatic Connections

Operational Instructions